Asbestos Management for Strata and Commercial Buildings Part 2

asbestos administration for strata andcommercial structures this is part 2 of the series that we were looking at before where in part 1 we were looking at the asbestos safety and eradication agency so that’s the agency they lay in for going rid of the asbestos in Australia so that’s the primary authority that’s looking after that but what we’re gonna into was the managing for the commercial-grade structures and their requirements that in there and we’ll go through the other report a little bit later on Okay, so any building before 2003 is required to havea asbestos register and it should be reviewed once every 5years to keep that up to date that’s where we’re talking about the obligations under that workplace health and safety Act so whoever is in the switch of the workplace he’s a responsible person and could beliable for not managing the workplace properly so that’s why we need to reduce the risks to the body corporate or the owners of the building to manage the asbestos as well as safety harzards Okay, so we need to make sure there’s a asbestos register in place and a administration plan to look after them so that’s you can either contact Sydney or myself and we can help you out in those areas from there so what we’ll do we’ll go through one of the other reports and another sections what need to look at.Alright so we were looking at the asbestos report andthen well seeming in each area and to see and howwe can identify what characters in the building and to be addressed where the asbestos sheeting is and how to manage that so once we’ve got that in our report thatneeds to be put into a cross-file so if we look in…so an asbestos conduct design so whoever comes to an onsite needs to be aware of the the asbestos on site and what risks are they gonna to…or what procedure are they gonna to do to minimise the risk so they don’t vex that asbestos also there is another document in now as well where did it depart no, it’s not that one asbestos cross-file, okay so…not it’s gone Alright, so whatever part of the building so we’re looking at that there okay, so it says asbestos administration scheme , now the other part of the cross-file that identified where the asbestos was in the building and whatcondition it was in so then that room you’ve got that full management of the site so you know where the asbestos is and the contractors only knew where that is alright, so if we go back to our other segment in here this is where we’re talking about the asbestos cross-file so that identifies where all fields of asbestos is in the building and there’s someparts in some of the buildings in the olderbuildings, some can be in the make-up the little cavities are being put into the windows that impound the windows into home, there’salso sometimes some asbestos in there that we’ve conclude and also some asbestos in the depict so it’s quite amazing where that where that has been found that’s for sure alright, so once we got those sections in there so we’re looking at having an asbestos register in place so that’s what we looked at really earlier on and we too get the contractors management intention in place so we know that whoever comeson the site the contractors know 1 not to ruffle it and 2 if they need to if there is gonna be any commotion then there needs to be adequate measures in place and monitoring so we don’t shock the fibers or we need to wet down the sphere so then all the materially is encapsulated, so that should give you a bit of new ideas on how the asbestos scheme they go together, so you can either contact Sydney or myself and be able help you in meeting the requirements of the legislation

As found on YouTube

Book Now For Asbestos Test In Newcastle